Woodman Point, Australia

  Click on image on the left to start slideshow
 




Client name : Woodman Point Wastewater Treatment Plant
Engineering Firm  :  W2W Alliance (Black & Veatch, SKM)
Installation : 6 x Purspring® 10,000
Design airflow : 125,200 m3/hr
(73,690 ft3/min)
Design requirement  :  ≥ 99.5% H2S removal
or ≤ 0.5 ppmv H2S ≥ 95% Odor Units (OU)
or ≤ 5,000 OU
Design loading : H2S: 150 ppmv average
300 ppmv peak



Bonita Springs, FL


Client name : Bonita Springs Utilities
Engineering Firm : CH2M Hill
Testing date : July 9, 2008
Installation : 3 x Purspring® 10,000
Design airflow : 17,000 ft3/min
Design loading : H2S: 150 ppmv average
300 ppmv peak



Woodbridge, NJ

 

Project  :  Woodbridge Avenue Pump Station
Client name  :  Township of Woodbridge
Engineering Firm  :  Alaimo Engineering
Construction Firm  :  Pact II, LLC Construction
Testing date  :  February 2009
Installation  :  1 x ZeroChem® 3600-4
Design airflow  :  4,600 ft3/min
Design loading  :  H2S: 75 ppmv average,
225 ppmv peak
5,000 D/T average,
50,000 D/T peak
Design requirement  :  ≥ 99.5% H2S removal,
or ≤ 0.5 ppmv H2S



Southerly, Columbus, Ohio


Client name  :  Southerly Waste Water Treatment Plant
Operations  :  Water treatment and reclamation
Facilities  :  Headworks
Engineering Firm  :  Malcolm Pirnie, Inc.
Construction Firm  :  Kokosing Construction Co.
Testing dates  :  October 7, 2008 -
November 1, 2008
Installation  :  10 x Purspring® 10,000
Design airflow  :  100,000 ft3/min
Design loading  :  3.5 ppmv average concentration,
33 ppmv max concentration of Hydrogen Sulfide (H2S)