Woodman Point, Australia
|
| Client name | : | Woodman Point Wastewater Treatment Plant |
|---|---|---|
| Engineering Firm | : | W2W Alliance (Black & Veatch, SKM) |
| Installation | : | 6 x Purspring® 10,000 |
| Design airflow | : | 125,200 m3/hr (73,690 ft3/min) |
| Design requirement | : | ≥ 99.5% H2S removal
or ≤ 0.5 ppmv H2S ≥ 95% Odor Units (OU) or ≤ 5,000 OU |
| Design loading | : | H2S: 150 ppmv average 300 ppmv peak |
Bonita Springs, FL
|
|
|
| Client name | : | Bonita Springs Utilities |
|---|---|---|
| Engineering Firm | : | CH2M Hill |
| Testing date | : | July 9, 2008 |
| Installation | : | 3 x Purspring® 10,000 |
| Design airflow | : | 17,000 ft3/min |
| Design loading | : | H2S: 150 ppmv average 300 ppmv peak |
Woodbridge, NJ
|
|
| Project | : | Woodbridge Avenue Pump Station |
|---|---|---|
| Client name | : | Township of Woodbridge |
| Engineering Firm | : | Alaimo Engineering |
| Construction Firm | : | Pact II, LLC Construction |
| Testing date | : | February 2009 |
| Installation | : | 1 x ZeroChem® 3600-4 |
| Design airflow | : | 4,600 ft3/min |
| Design loading | : |
H2S: 75 ppmv average,
225 ppmv peak 5,000 D/T average, 50,000 D/T peak |
| Design requirement | : |
≥ 99.5% H2S removal,
or ≤ 0.5 ppmv H2S |
Southerly, Columbus, Ohio
|
|
|
| Client name | : | Southerly Waste Water Treatment Plant |
|---|---|---|
| Operations | : | Water treatment and reclamation |
| Facilities | : | Headworks |
| Engineering Firm | : | Malcolm Pirnie, Inc. |
| Construction Firm | : | Kokosing Construction Co. |
| Testing dates | : | October 7, 2008 - November 1, 2008 |
| Installation | : | 10 x Purspring® 10,000 |
| Design airflow | : | 100,000 ft3/min |
| Design loading | : |
3.5 ppmv average concentration,
33 ppmv max concentration of Hydrogen Sulfide (H2S) |